ResourcesDocuments · calculators · references
What you need before, during and after the walkthrough
Security pack, ROI calculator, anonymised case studies — everything procurement and engineering will ask for
01 /What's available
Three resource tracks
Security
For IT and OT review. DMZ-first architecture, ISA/IEC 62443, SOC2, edge inference, selective transmission
Learn more →ROI calculator
For the business case. Inputs: lines, changeover time, OEE, downtime, operators, onboarding. Outputs: annual savings, payback
Learn more →Customer stories
By sector and OEM. Names disclosed under NDA
Learn more →
02 / FAQ
Common questions about production AI
Everything plant managers, ops directors, and IT/OT teams ask before bringing PackGuru onto their line
03 / Comparison
PackGuru vs traditional MES vs in-house BI
Why cosmetics manufacturers picking up PackGuru are skipping the 18-month MES project and the in-house BI build entirely
| Capability | PackGuru | Traditional MES | In-house BI / DIY |
|---|
When PackGuru wins: multi-SKU cosmetics or personal care production, packaging-OEM heavy, PackML/OPC-UA already in place or planned, leadership wants AI-grade insights without an 18-month MES project. When traditional MES wins: heavily regulated discrete manufacturing where ERP-MES integration is the primary buying driver. When DIY wins: a hyperscaler with 50+ in-house data engineers and a 5-year roadmap.
Anything else?
Ask. We'll send the right document by the end of the day